Purpose
To protect the confidentiality and integrity of Real-time Assessment and Real-time monitoring data transmitted between Control Centers.
Applicability
4.1. Functional Entities: The requirements in this standard apply to the following functional entities, referred to as “Responsible Entities,” that own or operate a Control Center.
…
Read more ›
Purpose
To study the impact of interconnecting new or materially modified Facilities on the Bulk Electric System.
Applicability
4.1. Functional Entities:
4.1.1 Planning Coordinator
4.1.2 Transmission Planner
4.1.3 Transmission Owner
4.1.4 Distribution Provider
4.1.5 Generator Owner
4.1.6 Applicable Generator Owner
4.1.6.1 Generator Owner with a fully executed Agreement to conduct a study on the reliability impact of interconnecting a third party Facility to the Generator Owner’s existing Facility that is used to interconnect to the Transmission system.
…
Read more ›