Purpose
To establish an integrated and coordinated approach to the design, evaluation, and reliable operation of Undervoltage Load Shedding Programs (UVLS Programs).
Applicability
4.1. Functional Entities
4.1.1 Planning Coordinator.
4.1.2 Transmission Planner.
4.1.3 Undervoltage load shedding (UVLS) entities – Distribution Providers and Transmission Owners responsible for the ownership,
…
Read more ›
Purpose
To prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring prompt action to prevent or mitigate instances of exceeding Interconnection Reliability Operating Limits (IROLs).
Applicability
4.1. Reliability Coordinator
4.2. Transmission Operator
4.3.
…
Read more ›
Purpose
To prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring prompt action to prevent or mitigate instances of exceeding Interconnection Reliability Operating Limits (IROLs).
Applicability
4.1. Functional Entities
4.1.1 Planning Authority and Planning Coordinator (hereafter collectively referred to as “Planning Coordinator”)
This proposed standard combines “Planning Authority” with “Planning Coordinator” in the list of applicable functional entities.
…
Read more ›
Purpose
To study the impact of interconnecting new or materially modified Facilities on the Bulk Electric System.
Applicability
4.1. Functional Entities:
4.1.1. Planning Coordinator
4.1.2. Transmission Planner
4.1.3. Transmission Owner
4.1.4.
…
Read more ›
Purpose
To establish consistent modeling data requirements and reporting procedures for development of planning horizon cases necessary
Applicability
4.1. Functional Entities
4.1.1 Balancing Authority
4.1.2 Generator Owner
4.1.3 Load Serving Entity
4.1.4 Planning Authority and Planning Coordinator (hereafter collectively referred to as “Planning Coordinator”)
This proposed standard combines “Planning Authority” with “Planning Coordinator” in the list of applicable functional entities.
…
Read more ›
Purpose
To ensure that assessments and validation of past events and databases can be performed, reporting of actual Demand data is needed. Forecast demand data is needed to perform future system assessments to identify the need for system reinforcement for continued reliability. In addition, to assist in proper real-time operating,
…
Read more ›
Purpose
To ensure that assessments and validation of past events and databases can be performed, reporting of actual demand data is needed. Forecast demand data is needed to perform future system assessments to identify the need for system reinforcement for continued reliability. In addition to assist in proper real-time operating,
…
Read more ›
Purpose
To ensure that assessments and validation of past events and databases can be performed, reporting of actual demand data is needed. Forecast demand data is needed to perform future system assessments to identify the need for system reinforcement for continued reliability. In addition, to assist in proper real-time operating,
…
Read more ›
Purpose
To ensure that Assessments and validation of past events and databases can be performed, reporting of actual demand data is needed. Forecast demand data is needed to perform future system assessments to identify the need for system reinforcement for continued reliability. In addition, to assist in proper real-time operating,
…
Read more ›
Purpose
To establish consistent data requirements, reporting procedures, and system models to be used in the analysis of the reliability of the interconnected transmission systems.
Applicability
- Transmission Owners specified in the data requirements and reporting procedures of MOD-013-0_R1
- Transmission Planners specified in the data requirements and reporting procedures of MOD-013-0_R1
- Generator Owners specified in the data requirements and reporting procedures of MOD-013-0_R1
- Resource Planners specified in the data requirements and reporting procedures of MOD-013-0_R1
Effective Date
April 1,
…
Read more ›