MOD-033-1: Steady-State and Dynamic System Model Validation

Purpose

To establish consistent validation requirements to facilitate the collection of accurate data and building of planning models to analyze the reliability of the interconnected transmission system.

Applicability

4.1. Functional Entities:

4.1.1 Planning Authority and Planning Coordinator (hereafter referred to as “Planning Coordinator”)

“Planning Coordinator”) This proposed standard combines “Planning Authority” with “Planning Coordinator” in the list of applicable functional entities.

Read more ›



CIP-005-5 – Cyber Security — Electronic Security Perimeter(s)

Purpose

To manage electronic access to BES Cyber Systems by specifying a controlled Electronic Security Perimeter in support of protecting BES Cyber Systems against compromise that could lead to misoperation or instability in the BES.

Applicability

4.1. Functional Entities: For the purpose of the requirements contained herein,

Read more ›



FAC-011-3 – System Operating Limits Methodology for the Operations Horizon

Purpose

To ensure that System Operating Limits (SOLs) used in the reliable operation of the Bulk Electric System (BES) are determined based on an established methodology or methodologies.

Applicability

4.1. Reliability Coordinator

5. Effective Date: See Implementation Plan for the Revised Definition of “Remedial Action Scheme”.

Read more ›



EOP-011-1 – Emergency Operations

Purpose

To address the effects of operating Emergencies by ensuring each Transmission Operator and Balancing Authority has developed Operating Plan(s) to mitigate operating Emergencies, and that those plans are coordinated within a Reliability Coordinator Area.

Applicability

4.1. Functional Entities:

4.1.1. Balancing Authority

4.1.2.

Read more ›



EOP-004-3 – Event Reporting

Purpose

To improve the reliability of the Bulk Electric System by requiring the reporting of events by Responsible Entities.

Applicability

4.1. Functional Entities: For the purpose of the Requirements and the EOP-004 Attachment 1 contained herein, the following functional entities will be collectively referred to as “Responsible Entity.”

4.1.1.

Read more ›



IRO-014-3 – Coordination Among Reliability Coordinators

Purpose

To ensure that each Reliability Coordinator’s operations are coordinated such that they will not adversely impact other Reliability Coordinator Areas and to preserve the reliability benefits of interconnected operations.

Applicability

4.1. Reliability Coordinator

Effective Date

See the Implementation Plan.

Read more ›



IRO-017-1: Outage Coordination

Purpose

To prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring prompt action to prevent or mitigate instances of exceeding Interconnection Reliability Operating Limits (IROLs).

Applicability

4.1. Reliability Coordinator

4.2. Transmission Operator

4.3.

Read more ›



IRO-008-2 – Reliability Coordinator Operational Analyses and Real-time Assessments

Purpose

Perform analyses and assessments to prevent instability, uncontrolled separation, or Cascading.

Applicability

4.1. Reliability Coordinator

Proposed Effective Date

See Implementation Plan.

Background

See Project 2014-03 project page.

Requirements and Measures

R1.

Read more ›



IRO-001-4: Reliability Coordination – Responsibilities

Purpose

To establish the responsibility of Reliability Coordinators to act or direct other entities to act.

Applicability

4.1. Reliability Coordinator

4.2. Transmission Operator

4.3. Balancing Authority

4.4. Generator Operator

4.5.

Read more ›



IRO-010-2 – Reliability Coordinator Data Specification and Collection

Purpose

To prevent instability, uncontrolled separation, or Cascading outages that adversely impact reliability, by ensuring the Reliability Coordinator has the data it needs to monitor and assess the operation of its Reliability Coordinator Area.

Applicability

4.1. Reliability Coordinator

4.2. Balancing Authority.

Read more ›