Purpose
To ensure that System Operating Limits (SOLs) used in the reliable planning of the Bulk Electric System (BES) are determined based on an established methodology or methodologies.
Applicability
4.1. Planning Authority
5. Effective Date: See Implementation Plan for the Revised Definition of “Remedial Action Scheme”
Requirements
R1.
…
Read more ›
Purpose
To prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring prompt action to prevent or mitigate instances of exceeding Interconnection Reliability Operating Limits (IROLs).
Applicability
4.1. Reliability Coordinator
4.2. Transmission Operator
4.3.
…
Read more ›
Purpose
To prevent instability, uncontrolled separation, or cascading outages that adversely impact the reliability of the interconnection by ensuring prompt action to prevent or mitigate instances of exceeding Interconnection Reliability Operating Limits (IROLs).
Applicability
4.1. Functional Entities
4.1.1 Planning Authority and Planning Coordinator (hereafter collectively referred to as “Planning Coordinator”)
This proposed standard combines “Planning Authority” with “Planning Coordinator” in the list of applicable functional entities.
…
Read more ›
Purpose
To have adequate data available to facilitate analysis of Bulk Electric System (BES) Disturbances.
Applicability
Functional Entities:
4.1 The Responsible Entity is:
4.1.1 Eastern Interconnection – Planning Coordinator
4.1.2 ERCOT Interconnection – Planning Coordinator or Reliability Coordinator
4.1.3 Western Interconnection – Reliability Coordinator
4.1.4 Quebec Interconnection – Planning Coordinator or Reliability Coordinator
4.2 Transmission Owner
4.3 Generator Owner
…
Read more ›
Purpose
To study the impact of interconnecting new or materially modified Facilities on the Bulk Electric System.
Applicability
4.1. Functional Entities:
4.1.1. Planning Coordinator
4.1.2. Transmission Planner
4.1.3. Transmission Owner
4.1.4.
…
Read more ›
Purpose
To establish consistent modeling data requirements and reporting procedures for development of planning horizon cases necessary
Applicability
4.1. Functional Entities
4.1.1 Balancing Authority
4.1.2 Generator Owner
4.1.3 Load Serving Entity
4.1.4 Planning Authority and Planning Coordinator (hereafter collectively referred to as “Planning Coordinator”)
This proposed standard combines “Planning Authority” with “Planning Coordinator” in the list of applicable functional entities.
…
Read more ›
Purpose
To provide a regional reliability standard that ensures the development of an effective automatic underfrequency load shedding (UFLS) program in order to preserve the security and integrity of the bulk power system during declining system frequency events in coordination with the NERC UFLS reliability standard characteristics.
Applicability
4.1.
…
Read more ›
Purpose
To establish design and documentation requirements for automatic underfrequency load shedding (UFLS) programs to arrest declining frequency, assist recovery of frequency following underfrequency events and provide last resort system preservation measures.
Applicability
- Planning Coordinators
- UFLS entities shall mean all entities that are responsible for the ownership,
…
Read more ›
Purpose
To ensure that assessments and validation of past events and databases can be performed, reporting of actual demand data is needed. Forecast demand data is needed to perform future system assessments to identify the need for system reinforcement for continued reliability. In addition, to assist in proper real-time operating,
…
Read more ›
Purpose
To ensure that Assessments and validation of past events and databases can be performed, reporting of actual demand data is needed. Forecast demand data is needed to perform future system assessments to identify the need for system reinforcement for continued reliability. In addition, to assist in proper real-time operating,
…
Read more ›