Operating Reserve -Spinning
The portion of Operating Reserve consisting of:
• Generation synchronized to the system and fully available to serve load within the Disturbance Recovery Period following the contingency event; or
• Load fully removable from the system within the Disturbance Recovery Period following the contingency event.