Active Standards
BAL
BAL-001-2 – Real Power Balancing Control Performance
BAL-001-TRE-1: Primary Frequency Response in the ERCOT Region
BAL-001-TRE-2 – Primary Frequency Response in the ERCOT Region
BAL-002-3: Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Even
BAL-002-WECC-2a — Contingency Reserve
BAL-003-1.1 – Frequency Response and Frequency Bias Setting
BAL-003-2 – Frequency Response and Frequency Bias Setting
BAL-004-WECC-3: Automatic Time Error Correction
BAL-005-1: Balancing Authority Control
BAL-502-RF-03: Planning Resource Adequacy Analysis, Assessment and Documentation
CIP
CIP-002-5.1a – Cyber Security – BES Cyber System Categorization
CIP-003-6 – Cyber Security – Security Management Controls
CIP-003-8 – Cyber Security — Security Management Controls
CIP-004-6 – Cyber Security – Personnel & Training
CIP-005-5 – Cyber Security — Electronic Security Perimeter(s)
CIP-005-6 — Cyber Security – Electronic Security Perimeter(s)
CIP-006-6 – Cyber Security – Physical Security of BES Cyber Systems
CIP-007-6 – Cyber Security – System Security Management
CIP-008-5 – Cyber Security – Incident Reporting and Response Planning
CIP-008-6 — Cyber Security — Incident Reporting and Response Planning
CIP-009-6 – Cyber Security – Recovery Plans for BES Cyber Systems
CIP-010-2 – Cyber Security – Configuration Change Management and Vulnerability Assessments
CIP-010-3 – Cyber Security — Configuration Change Management and Vulnerability Assessments
CIP-011-2 – Cyber Security – Information Protection
CIP-013-1 – Cyber Security – Supply Chain Risk Management
CIP-014-2: Physical Security
COM
COM-001-3 – Communications
COM-002-4 – Operating Personnel Communications Protocols
EOP
EOP-004-4 – Event Reporting
EOP-005-3: System Restoration from Blackstart Resources
EOP-006-3: System Restoration Coordination
EOP-008-2: Loss of Control Center Functionality
EOP-010-1 – Geomagnetic Disturbance Operations
EOP-011-1 – Emergency Operations
FAC
FAC-001-3 – Facility Interconnection Requirements
FAC-002-2 – Facility Interconnection Studies
FAC-002-3 – Facility Interconnection Studies
FAC-002-3 — Facility Interconnection Studies
FAC-003-4 – Transmission Vegetation Management
FAC-008-3: Facility Ratings
FAC-010-3 – System Operating Limits Methodology for the Planning Horizon
FAC-011-3 – System Operating Limits Methodology for the Operations Horizon
FAC-013-2: Assessment of Transfer Capability for the Near-term Transmission Planning Horizon
FAC-014-2: Establish and Communicate System Operating Limits
FAC-501-WECC-1: Transmission Maintenance
FAC-501-WECC-2: Transmission Maintenance
INT
INT-001-3: Interchange Information
INT-003-3: Interchange Transaction Implementation
INT-004-2: Dynamic Interchange Transaction Modifications
INT-004-3.1: Dynamic Transfers
INT-005-3: Interchange Authority Distributes Arranged Interchange
INT-006-3: Response to Interchange Authority
INT-006-4: Evaluation of Interchange Transactions
INT-006-5 – Evaluation of Interchange Transactions
INT-006-5 – Evaluation of Interchange Transactions
INT-007-1: Interchange Confirmation
INT-008-3: Interchange Authority Dis tributes Status
INT-009-1: Implementation of Interchange
INT-009-2.1: Implementation of Interchange
INT-010-1: Interchange Coordination Exemptions
INT-010-2.1: Interchange Initiation and Modification for Reliability
INT‐009‐3 — Implementation of Interchange
IRO
IRO-001-4: Reliability Coordination – Responsibilities
IRO-002-6 – Reliability Coordination – Monitoring and Analysis
IRO-006-5: Reliability Coordination — Transmission Loading Relief
IRO-006-EAST-2: Transmission Loading Relief Procedure for the Eastern Interconnection
IRO-006-WECC-2: Qualified Transfer Path Unscheduled Flow (USF) Relief
IRO-006-WECC-3: Qualified Path Unscheduled Flow (USF) Relief
IRO-008-2 – Reliability Coordinator Operational Analyses and Real-time Assessments
IRO-009-2 – Reliability Coordinator Actions to Operate Within IROLs
IRO-010-2 – Reliability Coordinator Data Specification and Collection
IRO-010-3 — Reliability Coordinator Data Specification and Collection
IRO-014-3 – Coordination Among Reliability Coordinators
IRO-017-1: Outage Coordination
IRO-018-1(i): Reliability Coordinator Real-time Reliability Monitoring and Analysis Capabilities
IRO‐002‐7 ‐ Reliability Coordination ‐ Monitoring and Analysis
MOD
MOD-001-1a: Available Transmission System Capability
MOD-004-1: Capacity Benefit Margin
MOD-008-1: TRM Calculation Methodology
MOD-020-0: Providing Interruptible Demands and DCLM Data
MOD-025-2: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability
MOD-026-1: Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions
MOD-027-1: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions
MOD-028-2: Area Interchange Methodology
MOD-029-2a: Rated System Path Methodology
MOD-030-3: Flowgate Methodology
MOD-031-2: Demand and Energy Data
MOD-031-3 — Demand and Energy Data
MOD-032-1: Data for Power System Modeling and Analysis
MOD-033-1: Steady-State and Dynamic System Model Validation
MOD-033-2 — Steady-State and Dynamic System Model Validation
NUC
NUC-001-3 – Nuclear Plant Interface Coordination
NUC-001-4— Nuclear Plant Interface Coordination
PER
PER-003-2: Operating Personnel Credentials
PER-005-2: Operations Personnel Training
PER-006-1 – Specific Training for Personnel
PRC
PRC-001-1.1 (ii): System Protection Coordination
PRC-002-2: Disturbance Monitoring and Reporting Requirements
PRC-004-5(i): Protection System Misoperation Identification and Correction
PRC-004-WECC-2: Protection System and Remedial Action Scheme Misoperation
PRC-005-1.1b: Transmission and Generation Protection System Maintenance and Testing
PRC-005-6: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
PRC-006-3: Automatic Underfrequency Load Shedding
PRC-006-5 — Automatic Underfrequency Load Shedding
PRC-006-NPCC-1: Automatic Underfrequency Load Shedding
PRC-006-NPCC-2 – Automatic Underfrequency Load Shedding
PRC-006-SERC-02:Automatic Underfrequency Load Shedding Requirements
PRC-008-0: Underfrequency Load Shedding Equipment Maintenance Programs
PRC-010-2: Undervoltage Load Shedding
PRC-011-0: UVLS System Maintenance and Testing
PRC-012-2 – Remedial Action Schemes
PRC-015-1: Remedial Action Scheme Data and Documentation
PRC-016-1: Remedial Action Scheme Misoperations
PRC-017-1: Remedial Action Scheme Maintenance and Testing
PRC-018-1: Disturbance Monitoring Equipment Installation and Data Reporting
PRC-019-2: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection
PRC-023-3: Transmission Relay Loadability
PRC-023-4: Transmission Relay Loadability
PRC-024-2: Generator Frequency and Voltage Protective Relay Settings
PRC-025-1: Generator Relay Loadability
PRC-025-2: Generator Relay Loadability
PRC-026-1: Relay Performance During Stable Power Swings
PRC-027-1 — Coordination of Protection Systems for Performance During Faults
PRC‐004‐6 — Protection System Misoperation Identification and Correction
TOP
TOP-001-4: Transmission Operations
TOP-002-4: Operations Planning
TOP-003-3: Operational Reliability Data
TOP-003-4 — Operational Reliability Data
TOP-010-1(i): Real-time Reliability Monitoring and Analysis Capabilities
TOP‐001‐5 ‐ Transmission Operations
TPL
TPL-001-4: Transmission System Planning Performance Requirements
TPL-007-4 – Transmission System Planned Performance for Geomagnetic Disturbance Events
VAR
VAR-001-5: Voltage and Reactive Control
VAR-002-4.1: Generator Operation for Maintaining Network Voltage Schedules
VAR-501-WECC-3.1: Power System Stabilizer (PSS)
Glossary
Home
›
Glossary Item
›
Interchange
Interchange
Energy transfers that cross
Balancing Authority
boundaries.
Related Articles:
Glossary: Area Interchange Methodology
Glossary: Flowgate
Glossary: Host Balancing Authority
Glossary: Interchange Authority
Glossary: Interchange Distribution Calculator
Related Terms:
Term: Balancing Authority
‹
Frequency Deviation
Joint Control
›
Search for:
Categories
BAL
BAL
CIP
CIP
COM
COM
EOP
EOP
FAC
FAC
INT
INT
IRO
IRO
MOD
MOD
NUC
PER
PER
PRC
PRC
TOP
TOP
TPL
TPL
Uncategorized
VAR
VAR