LiveWire Homepage
NERC Training LMS
↓ Skip to Main Content
LiveWire Homepage
NERC Training LMS
Search for:
LiveWire Homepage
NERC Training LMS
Active Standards
BAL
BAL-001-2 – Real Power Balancing Control Performance
BAL-001-TRE-1: Primary Frequency Response in the ERCOT Region
BAL-001-TRE-2 – Primary Frequency Response in the ERCOT Region
BAL-002-3: Disturbance Control Standard – Contingency Reserve for Recovery from a Balancing Contingency Even
BAL-002-WECC-2a — Contingency Reserve
BAL-003-1.1 – Frequency Response and Frequency Bias Setting
BAL-003-2 – Frequency Response and Frequency Bias Setting
BAL-004-WECC-3: Automatic Time Error Correction
BAL-005-1: Balancing Authority Control
BAL-502-RF-03: Planning Resource Adequacy Analysis, Assessment and Documentation
CIP
CIP-002-5.1a – Cyber Security – BES Cyber System Categorization
CIP-003-6 – Cyber Security – Security Management Controls
CIP-003-8 – Cyber Security — Security Management Controls
CIP-004-6 – Cyber Security – Personnel & Training
CIP-005-5 – Cyber Security — Electronic Security Perimeter(s)
CIP-005-6 — Cyber Security – Electronic Security Perimeter(s)
CIP-006-6 – Cyber Security – Physical Security of BES Cyber Systems
CIP-007-6 – Cyber Security – System Security Management
CIP-008-5 – Cyber Security – Incident Reporting and Response Planning
CIP-008-6 — Cyber Security — Incident Reporting and Response Planning
COM
COM-001-3 – Communications
COM-002-4 – Operating Personnel Communications Protocols
EOP
EOP-004-4 – Event Reporting
EOP-005-3: System Restoration from Blackstart Resources
EOP-006-3: System Restoration Coordination
EOP-008-2: Loss of Control Center Functionality
EOP-010-1 – Geomagnetic Disturbance Operations
EOP-011-1 – Emergency Operations
FAC
FAC-001-3 – Facility Interconnection Requirements
FAC-002-2 – Facility Interconnection Studies
FAC-002-3 – Facility Interconnection Studies
FAC-002-3 — Facility Interconnection Studies
FAC-003-4 – Transmission Vegetation Management
FAC-008-3: Facility Ratings
FAC-010-3 – System Operating Limits Methodology for the Planning Horizon
FAC-011-3 – System Operating Limits Methodology for the Operations Horizon
FAC-013-2: Assessment of Transfer Capability for the Near-term Transmission Planning Horizon
FAC-014-2: Establish and Communicate System Operating Limits
INT
INT-001-3: Interchange Information
INT-003-3: Interchange Transaction Implementation
INT-004-2: Dynamic Interchange Transaction Modifications
INT-004-3.1: Dynamic Transfers
INT-005-3: Interchange Authority Distributes Arranged Interchange
INT-006-3: Response to Interchange Authority
INT-006-4: Evaluation of Interchange Transactions
INT-006-5 – Evaluation of Interchange Transactions
INT-006-5 – Evaluation of Interchange Transactions
INT-007-1: Interchange Confirmation
IRO
IRO-001-4: Reliability Coordination – Responsibilities
IRO-002-6 – Reliability Coordination – Monitoring and Analysis
IRO-006-5: Reliability Coordination — Transmission Loading Relief
IRO-006-EAST-2: Transmission Loading Relief Procedure for the Eastern Interconnection
IRO-006-WECC-2: Qualified Transfer Path Unscheduled Flow (USF) Relief
IRO-006-WECC-3: Qualified Path Unscheduled Flow (USF) Relief
IRO-008-2 – Reliability Coordinator Operational Analyses and Real-time Assessments
IRO-009-2 – Reliability Coordinator Actions to Operate Within IROLs
IRO-010-2 – Reliability Coordinator Data Specification and Collection
IRO-010-3 — Reliability Coordinator Data Specification and Collection
MOD
MOD-001-1a: Available Transmission System Capability
MOD-004-1: Capacity Benefit Margin
MOD-008-1: TRM Calculation Methodology
MOD-020-0: Providing Interruptible Demands and DCLM Data
MOD-025-2: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability
MOD-026-1: Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions
MOD-027-1: Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions
MOD-028-2: Area Interchange Methodology
MOD-029-2a: Rated System Path Methodology
MOD-030-3: Flowgate Methodology
NUC
NUC-001-3 – Nuclear Plant Interface Coordination
NUC-001-4— Nuclear Plant Interface Coordination
PER
PER-003-2: Operating Personnel Credentials
PER-005-2: Operations Personnel Training
PER-006-1 – Specific Training for Personnel
PRC
PRC-001-1.1 (ii): System Protection Coordination
PRC-002-2: Disturbance Monitoring and Reporting Requirements
PRC-004-5(i): Protection System Misoperation Identification and Correction
PRC-004-WECC-2: Protection System and Remedial Action Scheme Misoperation
PRC-005-1.1b: Transmission and Generation Protection System Maintenance and Testing
PRC-005-6: Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance
PRC-006-3: Automatic Underfrequency Load Shedding
PRC-006-5 — Automatic Underfrequency Load Shedding
PRC-006-NPCC-1: Automatic Underfrequency Load Shedding
PRC-006-NPCC-2 – Automatic Underfrequency Load Shedding
TOP
TOP-001-4: Transmission Operations
TOP-002-4: Operations Planning
TOP-003-3: Operational Reliability Data
TOP-003-4 — Operational Reliability Data
TOP-010-1(i): Real-time Reliability Monitoring and Analysis Capabilities
TOP‐001‐5 ‐ Transmission Operations
TPL
TPL-001-4: Transmission System Planning Performance Requirements
TPL-007-4 – Transmission System Planned Performance for Geomagnetic Disturbance Events
VAR
VAR-001-5: Voltage and Reactive Control
VAR-002-4.1: Generator Operation for Maintaining Network Voltage Schedules
VAR-501-WECC-3.1: Power System Stabilizer (PSS)
Glossary
Home
›
Glossary Item
›
Fire Risk
Fire Risk
The likelihood that a fire will ignite or spread in a particular geographic area.
‹
Distribution Factor [DF]
Frequency Error
›
Search for:
Categories
BAL
BAL
CIP
CIP
COM
COM
EOP
EOP
FAC
FAC
INT
INT
IRO
IRO
MOD
MOD
NUC
PER
PER
PRC
PRC
TOP
TOP
TPL
TPL
Uncategorized
VAR
VAR
Top