VAR-501-WECC-3: Power System Stabilizer (PSS)

Purpose

To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions by establishing the performance criteria for WECC power system stabilizers.

Applicability

4.1. Generator Operator

4.2. Generator Owner

Facilities

This standard applies to synchronous generators,

Read more ›



VAR-001-4.1: Voltage and Reactive Control

Purpose

To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained within limits in Real-time to protect equipment and the reliable operation of the Interconnection.

Applicability

4.1. Transmission Operators

4.2. Generator Operators within the Western Interconnection (for the WECC Variance)

Effective Date

The standard shall become effective on the first day of the first calendar quarter after the date that the standard is approved by an applicable governmental authority or as otherwise provided for in a jurisdiction where approval by an applicable governmental authority is required for a standard to go into effect.

Read more ›



VAR-002-4: Generator Operation for Maintaining Network Voltage Schedules

Purpose

To ensure generators provide reactive support and voltage control, within generating Facility capabilities, in order to protect equipment and maintain reliable operation of the Interconnection.

Applicability

4.1. Generator Operator

4.2. Generator Owner

Effective Dates

See Implementation Plan.

Read more ›



VAR-501-WECC-2: Power System Stabilizer (PSS)

Purpose

To ensure that Power System Stabilizers (PSS) on synchronous generators shall be kept in service

Applicability

4.1. Generator Operators

Effective Date

On the first day of the first quarter, after applicable regulatory approval.

Requirements

R1.

Read more ›



VAR-002-WECC-2: Automatic Voltage Regulators (AVR)

Purpose

To ensure that Automatic Voltage Regulators on synchronous generators and condensers shall be kept in service and controlling voltage.

Applicability

4.1. Generator Operators

4.2. Transmission Operators that operate synchronous condensers

4.3. This VAR-002-WECC-2 Standard only applies to synchronous generators and synchronous condensers that are connected to the Bulk Electric System

Effective Date

On the first day of the first quarter,

Read more ›



VAR-002-3: Generator Operation for Maintaining Network Voltage Schedules

Purpose
To ensure generators provide reactive support and voltage control, within  generating Facility capabilities, in order to protect equipment and maintain reliable operation of the Interconnection.

Applicability
4.1. Generator Operator
4.2. Generator Owner

Effective Dates
The standard shall become effective on the first day of the first calendar quarter after  the date that the standard is approved by an applicable governmental authority or as otherwise provided for in a jurisdiction where approval by an applicable governmental authority is required for a standard to go into effect.

Read more ›



VAR-001-4: Voltage and Reactive Control

Purpose
To ensure that voltage levels, reactive flows, and reactive resources are monitored,  controlled, and maintained within limits in real time to protect equipment and the reliable operation of the Interconnection.

Applicability
4.1. Transmission Operators

4.2. Generator Operators within the Western Interconnection (for the WECC Variance)

Effective Date
The standard shall become effective on the first day of the first calendar quarter  after the date that the standard is approved by an applicable governmental authority or as otherwise provided for in a jurisdiction where approval by an applicable governmental authority is required for a standard to go into effect.

Read more ›



VAR-002-WECC-1: Automatic Voltage Regulators (AVR)

Purpose
To ensure that Automatic Voltage Regulators on synchronous generators and condensers shall be kept in service and controlling voltage.

Applicability

  • Generator Operators
  • Transmission Operators that operate synchronous condensers
  • This VAR-002-WECC-1 Standard only applies to synchronous generators and synchronous condensers that are connected to the Bulk Electric System.

Read more ›



VAR-501-WECC-1: Power System Stabilizer (PSS)

Purpose
To ensure that Power System Stabilizers (PSS) on synchronous generators shall be kept in service.

Applicability
Generator Operators

Effective Date
On the first day of the first quarter, after applicable regulatory approval.

Requirements
R1.

Read more ›