Blog Archives

PRC-004-WECC-1: Protection System and Remedial Action Scheme Misoperation

Purpose
Regional Reliability Standard to ensure all transmission and generation Protection System and Remedial Action Scheme (RAS) Misoperations on Transmission Paths and RAS defined in section 4 are analyzed and/or mitigated.

Applicability

  • Transmission Owners of selected WECC major transmission path facilities and RAS listed in tables titled “Major WECC Transfer Paths in the Bulk Electric System” provided here and “Major WECC Remedial Action Schemes (RAS)” provided here.

Read more ›



PRC-002-NPCC-01: Disturbance Monitoring

Purpose
Ensure that adequate disturbance datais available to facilitate Bulk Electric System event analyses. All references to equipment and facilities herein unless otherwise noted will be to Bulk Electric System (BES) elements.

Applicability

  • Transmission Owner
  • Generator Owner
  • Reliability Coordinator

(Proposed) Effective Date
To be established

Requirements
R1.

Read more ›



Top