EOP-004-3 – Event Reporting

Purpose

To improve the reliability of the Bulk Electric System by requiring the reporting of events by Responsible Entities.

Applicability

4.1. Functional Entities: For the purpose of the Requirements and the EOP-004 Attachment 1 contained herein, the following functional entities will be collectively referred to as “Responsible Entity.”

4.1.1.

Read more ›



EOP-008-1: Loss of Control Center Functionality

Purpose
Ensure continued reliable operations of the Bulk Electric System (BES) in the event that a control center becomes inoperable.

Applicability

  • Transmission Operator.
  • Reliability Coordinator.
  • Balancing Authority.

Effective Date
The first day of the first calendar quarter twenty-four months after applicable regulatory approval.

Read more ›



EOP-006-2: System Restoration Coordination

Purpose
Ensure plans are established and personnel are prepared to enable effective coordination of the System restoration process to ensure reliability is maintained during restoration and priority is placed on restoring the Interconnection.

Applicability
Reliability Coordinators

Proposed Effective Date
Twenty-four months after the first day of the first calendar quarter following applicable regulatory approval.

Read more ›



EOP-005-2: System Restoration from Blackstart Resources

Purpose
Ensure plans, Facilities, and personnel are prepared to enable System restoration from Blackstart Resources to assure reliability is maintained during restoration and priority is placed on restoring the Interconnection.

Applicability

  • Transmission Operators.
  • Generator Operators.
  • Transmission Owners identified in the Transmission Operators restoration plan.

Read more ›



EOP-004-2: Event Reporting

Purpose
To improve the reliability of the Bulk Electric System by requiring the reporting of events by Responsible Entities.

Applicability
Functional Entities: For the purpose of the Requirements and the EOP-004 Attachment 1 contained herein, the following functional entities will be collectively referred to as “Responsible Entity.”

  • Reliability Coordinator
  • Balancing Authority
  • Transmission Owner
  • Transmission Operator
  • Generator Owner
  • Generator Operator
  • Distribution Provider

Effective Dates
The first day of the first calendar quarter that is six months beyond the date that this standard is approved by applicable regulatory authorities.

Read more ›



EOP-003-2: Load Shedding Plans

Purpose
A Balancing Authority and Transmission Operator operating with insufficient generation or transmission capacity must have the capability and authority to shed load rather than risk an uncontrolled failure of the Interconnection.

Applicability

  • Transmission Operators.
  • Balancing Authorities.

Effective Date
One year following the first day of the first calendar quarter after applicable regulatory approvals (or the standard otherwise becomes effective the first day of the first calendar quarter after NERC Board of Trustees adoption in those jurisdictions where regulatory approval is not required).

Read more ›



EOP-002-3.1: Capacity and Energy Emergencies

Purpose
To ensure Reliability Coordinators and Balancing Authorities are prepared for capacity and energy emergencies.

Applicability

  • Balancing Authorities.
  • Reliability Coordinators.
  • Load-Serving Entities.

(Proposed) Effective Date
First day of the first calendar quarter six months following applicable regulatory approval;

Read more ›



EOP-001-2.1b: Emergency Operations Planning

Purpose
Each Transmission Operator and Balancing Authority needs to develop, maintain, and implement a set of plans to mitigate operating emergencies. These plans need to be coordinated with other Transmission Operators and Balancing Authorities, and the Reliability Coordinator.

Applicability

  • Balancing Authorities.

Read more ›