Transmission Planning

TPL-007-3: Transmission System Planned Performance for Geomagnetic Disturbance

Purpose
Establish requirements for Transmission system planned performance during geomagnetic disturbance (GMD) events.

Applicability

4.1.1.  Planning Coordinator with a planning area that includes a Facility or Facilities specified in 4.2;

Read more ›



TPL-001-4: Transmission System Planning Performance Requirements

Purpose

Establish Transmission system planning performance requirements within the planning horizon to develop a Bulk Electric System (BES) that will operate reliably over a broad spectrum of System conditions and following a wide range of probable Contingencies.

Applicability

  • Planning Coordinator
  • Transmission Planner

Effective Date
Requirements R1 and R7 as well as the definitions shall become effective on the first day of the first calendar quarter,

Read more ›